Government – Toronto Island Flood Mitigation

Owner: TRCA

Client: Baird

Project: Toronto Island Flood Mitigation

Description:  The Toronto Island Flood Mitigation Project aims to protect the islands from future high-water events through long-term flood and erosion control measures. Key engineering components include shoreline stabilization, installation of naturalized berms, and enhanced drainage systems. The project also involves constructing flood barriers and upgrading existing infrastructure to withstand extreme weather conditions. These efforts will safeguard residents, businesses, and public spaces, ensuring the islands remain a safe and enjoyable destination.

Role:  4Sight’s role is to provide Subsurface Utility Engineering services to manage identify the presence of existing utility infrastructure that could be impacted by the proposed flood mitigation measures being designed for the island.

Services Used: SUE

Related Projects

Utilities – Toronto Western Hospital WET Project

May 1, 2025

Owner: Noventa Energy Client: Bird Construction Project: TWH – Wastewater Energy Transfer Project […]

Government – Darlington SMR Project

May 1, 2025

Owner: Ontario Power Generation  Client: ES Fox Project: Small Modular Reactor Project – […]

 Developer – Barrington Development

May 1, 2025

Owner: Crombie REIT Client: Crombie REIT / Halifax Water Project: Sewer Mapping – Barrington […]

4Sight-Utility-Engineers-White-Logo

Contact

P: 1 (905) 424-1959
E: info@4sightue.com

Address

Headquarters

4Sight Head Office
2100 Forbes Street, Unit 1
Whitby, ON 
L1N 9T3

© 2024 All Rights Reserved | Contact Us

CanadaFlagWhite