Owner: TRCA
Client: Baird
Project: Toronto Island Flood Mitigation
Description: The Toronto Island Flood Mitigation Project aims to protect the islands from future high-water events through long-term flood and erosion control measures. Key engineering components include shoreline stabilization, installation of naturalized berms, and enhanced drainage systems. The project also involves constructing flood barriers and upgrading existing infrastructure to withstand extreme weather conditions. These efforts will safeguard residents, businesses, and public spaces, ensuring the islands remain a safe and enjoyable destination.
Role: 4Sight’s role is to provide Subsurface Utility Engineering services to manage identify the presence of existing utility infrastructure that could be impacted by the proposed flood mitigation measures being designed for the island.
Services Used: SUE